淡輪山荘の屋根裏階段、完成。手すりも検討
2025年12月19日、淡輪山荘の屋根裏階段が完成。手すりの取付け位置を検討。急角度の階段のため、安心して登れるように手すりは必須のものです。
Attic Staircase at Tannowa Sanso Completed. Handrail Positioning is Under Consideration
December 19, 2025: With the attic staircase at Tannowa Sanso completion, now that we discuss the position of the handrails. Due to the steep angle of the stairs, where to attach, the position, the length and the angles are the critical elements of handrails to ensure safe climbing.